    Tools and techniques for quality plan preparation
    0:25
    The control process runs through the whole project.
    0:24
    Start process group, plan process group
    0:23
    The weak matrix organizational structure basically
    0:22
    Good coordination ability, good professional ethics
    0:26
    2) Project management: project management is
    0:23
    Player, strategy set, winning function. Chapter
    0:22
    (5) Environmental and organizational factors
    0:24
    1: EAC = (ACWP / BCWP) * BAC with the same ratio
    0:23
    Schedule deviation Sv (schedulevariance) (SV = ev-pv)
    0:25
    Is the budget value of the work actually completed
    0:24
    The cost can be determined by comparing
    0:23
    At the same time, ensure that all relevant changes
    0:21