M

Maddog's Adventures

45 Followers
    Day 44 South wall siding removed, one window installed
    2:27
    Day 43 Spare bath tub and shower, bedroom door gone
    5:14
    Day 42 removed and installed windows
    2:15
    Day 41 front porch siding, laundry room wall damage fixed
    6:45
    Day 40 living room window and siding
    2:59
    Day 39 finished subfloor, installed front door.
    4:49
    Day 38 all ceiling drywall hung, did some yard work
    3:51
    Day 36 most of plywood laid, started ceiling drywall
    5:45
    Day 35 laid plywood
    3:25
    Day 34 basement toilet working, ceiling trusses planed
    2:46
    Day 33 started trimming ceiling trusses
    7:19
    Day 32 kitchen, dining, living room sub floor ripped up.
    7:29
    Day 30 Time consuming odds and ends work
    5:24
    Day 27 Master bed outlets, spare bed and bath wiring
    4:38
    Day 28 Easter Sunday, April Fools Day
    6:31
    Day 26 bed and bath light wiring, started laying down sub floor
    9:26
    Day 25 Kitchen, dining wiring, Karen ripped up sub floor
    6:27
    Day 24 Ceiling boxes in, kitchen wiring, water softener drain
    3:59
    Day 23 water softener installed, rain gutters, outlet boxes
    6:10
    Day 22 Removed all useless wire, re-wired the breaker box
    2:52
    Day 21 finished front siding and traced wires
    6:12
    Day 20 foam board and vinyl siding
    4:08