Day 31 surround sound conduit, laid some subfloor, ripped up kitchen flooring

10 months ago
95

Ran the surround sound conduit in the attic, wired 3 of the security cameras, laid the last 3 sheets of OSB and ripped up the linoleum in the dining and kitchen.

Loading comments...