DitchDigger2

DitchDigger2

5 Followers
    House Demolition. But first, which water line goes where?
    24:55
    A good old Hillbilly Country burn day!
    17:30
    3 Line Sewer and 6 inch Water Service Completed.
    16:00
    6 inch C900 Water Main Service Install.
    15:00
    Site prepping a new Dig.
    16:35
    Tom Sawyer'd Into A job / Worst Dig of my Career!
    32:05
    ShortPlat Phase 11 -SubGrade / Swale / Moving Out
    17:40
    ShortPlat Phase 10 / DryWell Installation
    10:39
    ShortPlat Phase 09 Part 2 / Utility Backfill
    8:52
    ShortPlat Phase 09 Part 1 / Utility Dig - Power, Gas, Communications
    20:52
    ShortPlat 08 / Sewer (Part 2) Finish Digging and Installing Pipe.
    13:09
    ShortPlat 07 Sewer (Part 1) Open Road / Tap Main
    8:03
    ShortPlat Assignment 06 / Foundation Crawl Space Dig
    7:58
    ShortPlat Assignment 05 / Compaction Test
    8:24
    ShortPlat Assignment 04 / Two Water Line Taps and Trench
    13:22
    ShortPlat Assignment 03 Garbage Day / Stacking piles
    12:31
    ShortPlat Assignment 02 Grub Organics
    4:23
    ShortPlat Assignment 01 Erosion Control
    13:35
    Epic 3000 Gallon Septic System Dig / Found Unsleeved Water Line
    7:44