Environment Friendly Fracking Company Re-Plants Trees & Returns Land To Nature - RECLAMATION
Land Reclamation - When a well finishes producing oil or gas, on average after 20 years, the last stage of the lifecycle of a well begins. This step, known as reclamation, is the process of returning the land as close as possible to its original form and use. This requires removing equipment and replanting the site with native vegetation, and can take up to five years or more to complete.
Regulators like the Energy Resources Conservation Board (ERCB) in Alberta require exploration and production (E&P) companies to make every effort to have the least amount of impact on the environment, so it’s easier to return the land to its original use.
This has dramatically affected how wells are drilled in Canada. For example, the area cleared for well pad installations has been reduced by about 40 per cent today compared to the 1970s, and drilling multiple wells from a single pad has become commonplace. (Source: Our Petroleum Challenge)
Steps in Reclamation:
Planning: Reclamation plans are required when applying for a license to drill.
Landscape designs: These plans take into consideration reintroducing appropriate vegetation and the creation of visually pleasing and functional landscapes.
Material handling: Once the general shape of the land has been formed, top soil can be placed. This soil is often made up of organic materials from the forest floor which contains seeds and roots of plants.
Re-vegetation or reforestation: Land is re-planted by smoothing top soil, placing fertilizer, seeding and harrowing. In reforestation, trees and a variety of shrubs are included in the planting mix.
Monitoring: After reclamation, E&P companies monitor the health of trees and soil. Seedling plants are assessed one year after planting and then at five-year intervals. Soil is also assessed by collecting samples and analyzing them for chemical and physical properties.
Certification: Government regulators certify land as reclaimed when reclamation is determined to be complete. This certification releases E&P companies from their land lease. However, E&P companies are held to a 25-year liability for surface reclamation issues and a lifetime liability for contamination. (Source: Syncrude Canada Ltd.)
In Alberta, Alberta Environment and Sustainable Resource Development conducts audits through field inspections at approximately 15 per cent of the sites to ensure guidelines have been met. Certificates can be cancelled if sites do not meet the remediation requirements or reclamation criteria. (Source: ERCB)
In Canada, the lifecycle of a well is a complex and highly regulated process. This process ensures Canada’s vast energy resources are accessed efficiently and with as few environmental impacts as possible.
-
49:45
Knowledge Land
10 months agoFuture War Technology - Armies of Tomorrow
400 -
1:50
KGUN
3 years agoArizona Theatre Company returns with original show
94 -
2:51:00
Fresh and Fit
5 hours agoWomen Claim To Give Better Dating Advice So We Did THIS...
85.9K31 -
5:16:50
CHiLi XDD
6 hours ago[F EM UP Friday] Take # 2 [Destiny 2] Lets Kick Some A$$! #RumbleTakeOver
28.7K1 -
5:13:43
ItsMossy
12 hours agoHALO WITH THE RUMBLERS (: #RUMBLETAKEOVER
24.5K1 -
1:54:08
INFILTRATION85
5 hours agoHi, I'm INFILTRATION
28.9K9 -
LIVE
GuardianRUBY
7 hours agoRumble Takeover! The Rumblings are strong
2,588 watching -
4:28:45
Etheraeon
14 hours agoWorld of Warcraft: Classic | Fresh Level 1 Druid | 500 Follower Goal
40.3K -
3:17:21
VapinGamers
6 hours ago $3.41 earned🎮🔥Scrollin’ and Trollin’: ESO Adventures Unleashed!
27.4K2 -
LIVE
a12cat34dog
8 hours agoGETTING AFTERMATH COMPLETED :: Call of Duty: Black Ops 6 :: ZOMBIES CAMO GRIND w/Bubba {18+}
171 watching