Massive Remodel - Week 12

3 years ago
38

Ok its been 2 weeks since the last video and a lot of work has been done. The counter top has been installed in the kitchen cabinets, sink. The final outside windows installed for the cathedral windows, all of the outside trim installed and just needs paint on the master bedroom outside windows. All the doors have been removed for painting, the baseboard and the door trims are up for painting. 1st floor window trim and baseboards are painted. Its beginning to look like we may be able to move into some rooms soon.