Dehner Corporation uses a job-order costing system with a single plantwide predetermined

2 days ago
15

Dehner Corporation uses a job-order costing system with a single plantwide predetermined overhead rate based on direct labor-hours. The company based its predetermined overhead rate for the current year on the following data:

Total direct labor-hours 47,000
Total fixed manufacturing overhead cost $ 202,100
Variable manufacturing overhead per direct labor-hour $ 2.00
Recently, Job P951 was completed with the following characteristics:

Number of units in the job 50
Total direct labor-hours 100
Direct materials $ 850
Direct labor cost $ 4,700
The total job cost for Job P951 is closest to:

Note: Round your intermediate calculations to 2 decimal places.

Multiple Choice
$6,180
$1,480
$5,550
$5,330

#CostAccounting
#Accounting
#Techniques
#Answered

Loading comments...