⚒️ @ Work Deep In The Tunnels Building The Underground Train Station 2014 To 2018🚇 Ottawa Stage 1 OLRT 🚂

2 months ago
153

Stage 1 of the Ottawa Light Rail Transit (OLRT) project, also known as the Confederation Line, is a significant part of Ottawa’s public transit system. Here are some key details:

Route and Stations: The Confederation Line runs 12.5 km from Blair Station in the east to Tunney’s Pasture in the west, passing through a 2.5 km downtown tunnel. It includes 13 stations, with the three downtown stations having 120-metre platforms and the others 90-metre platforms1.
Service: The line offers frequent service, with peak times seeing trains approximately every 5 minutes. The end-to-end travel time is less than 30 minutes under normal operating conditions2.
Infrastructure: The project features modern trains and stations, designed to improve connectivity and reduce travel times across the city3.
Stage 1 has been a major step in enhancing Ottawa’s transit infrastructure, providing a reliable and efficient mode of transportation for residents and visitors alike.

Loading 5 comments...