In this episode, "Building the Shop - Part 25 - Fitting and Installing Insulation and Vapour Barrier", we are installing our Amvic Silverboard EPS Insulation.
This was a lot of fun working with my wife Katie and son Elijah as we insulate the base of the shop.
We cut all the corner pieces and got them all fitting together nicely.
I thought this process was going to be harder than it was but it turned out really well.
The EPS is very light and easy to move around.
All the gaps, corners and form walls now all have insulation. I really wish I would have talked to the Engineers to ensure that I could have also used in on the footings. I found out after that they do this themselves.
Oh well, what can I say? Next time. :)
We also installed the vapour barrier and taped it all exexcept for the bottom driveway corner. We don't want to create a pool so we want any rain water to be able to drain out.
We started building the rebar chairs outside the base and Elijah and I can just carry it over and set it in place.
Until the next one, keep Living the Northern Life!

You can help support the channel if you Subscribe and hit the Bell notification for All updates so that you are notified when I post a new video.
We have a new Patreon account as well if you would be willing to support us this way as well.
https://www.patreon.com/livingthenorthernlife
You can also help support the channel by clicking on the links to any of the items below.
Even if you choose not to purchase any of these items we would receive a commission if you purchase any item from Amazon within 24 hours of clicking on any link below.

Amazon Affiliate Link
Canada: https://amzn.to/31AufV8
USA: https://amzn.to/34HXNT2

9 inch Chainsaw Tooth Brush Blade
Canada: https://amzn.to/2CQJPm7
USA: https://amzn.to/2ECFlQB

0:00 Intro
0:10 Plans
1:26 Tuck Taping the EPS joint on the Slope
5:00 Cutting the EPS For the Form Walls
7:32 Squaring the top of the Forms
8:33 Installing Vapour Barrier
9:28 Building the Rebar Chairs with 15mm Rebar
11:14 Putting the First Rebar Chair into the Base
11:27 Closing Remarks
13:15 Outro