Well Drilling & Tractor out for Repairs

3 months ago
54

We're kind of stalled at the moment. Tractor out, and the motor to the drill blew. The company drilling is waiting for the a repaired motor to be finished so they can install it and get back to drilling. So far they're at about 160 feet and 5 gpm. They'll continue to drill down to about 300 feet hoping to hit another vein. if they do, we'll have a very good well. Basically we're all caught up on everything until something gets fixed.

Loading comments...