Rekeying A 3-Story Building | Leading From The Front With Uriah | Episode #13

7 months ago
33

On today's episode of Leading From The Front, Uriah takes charge with a longer project: rekeying a 3-story building. This customer needed a renovation in their master key system to ensure their security was accurate and up-to-date. Turns out, the previous company may have taken a few shortcuts with their work...

Meanwhile, in the Guardian Safe & Lock office, another large-scale customer dropped off over 20 padlocks to be rekeyed and needed 20 copies of each key... leading to hundreds of keys needing to cut and stamped!

Thank you to our friends over at UHS hardware for sponsoring today's video!

Visit our website: https://www.guardiansafeandlock.com
Like us on Facebook: https://www.facebook.com/GuardianSafeandLock/
Follow us on Twitter: https://twitter.com/GuardianLock
Follow us on Instagram: https://www.instagram.com/guardiansafeandlock/
Follow us on Linkedin: https://www.linkedin.com/company/8319347

Loading comments...