#02 Second video working on the Fuselage Pt. 2 of 2

9 months ago
21

Hello everyone and welcome back to the channel. In this video which is part II of the series I am fabricating (or assembling) the Control Column Mounting Bracket. The video spans a few days while I worked around life events, store closures and probably the biggest problem was the rivet gun not wanting to put in two rivets that I needed to get the job done the first night. So I hope you enjoy the video, perhaps it helps you get something done on your build, or you just enjoy watching. Either way if you see something I can do better (camera angles I’m still working on & perhaps more real time video) leave a comment so I know what you are thinking, good or bad, I want to hear it.

Any tools or special items used in the video I’ve now listed below, all items were purchased on Amazon and I didn’t list prices because they’ve gone way up from when I ordered at the end of 2020.

- Forney 20857 Tap Magic Industrial Pro Cutting Fluid, 4 oz

- Starrett 18A Automatic Center Punch with Hardened Steel Metal, Universal Tool for Machinists and Carpenters with Adjustable Knurled Cap to Control Blow Force, No. 4 Graduation

- AFA Tooling - Deburring Tool with 10 Extra High Speed Steel Blades - Works on Metal, Resin, PVC, and 3D Printed Plastic Edges - Great for Copper and PVC Pipes, 3D Printing, Resin Art, and Metal Work

- Loctite 680 442-68015 10ml Retaining Compound, High Strength and Viscosity, Green Color

- Yost Tools-50005 5 in. Heavy Duty Drill Press Vise - Blue

Loading comments...