Halifax High Level Railway Part 4. Wheatley tunnel to Holmfield railway station.

11 months ago
37

The Halifax High Level Railway was first planned in 1884 where it was envisaged the line would run from the Queensbury Line at Holmfield and provide a new through route to Huddersfield and beyond. This never got beyond the planning stage so only a short 3mile long branch was constructed as far as the St Paul's area of King Cross which opened to Pellon Station on the 1st August 1890 and through to St Paul's on the 5th September 1890.

The line although busy for goods was never overly popular with passengers, the short 1.3 mile journey to Halifax Old Station taking over 30 minutes including a change at Holmfield, and by the time trams had reached the Pellon and King Cross areas of Halifax by the turn of the century passengers numbers had dwindled.

Loading comments...