The Largest Building using a 3D Printer

1 year ago
56

It only took 140 hours to build the largest 3D-printed building in Europe. Instead of dozens of builders, only 2 people and robots are required at the facility. Even the painting of the building is carried out by a robot. The future of Technology.

Loading 1 comment...