3 Podcasters #16- R.T. is on a well pad, David talks "Wind Power Fails At The Worst Possible Time".

1 year ago
36

R.T. is on a well pad, and we got to see one of his rig hands, and they grow them big out in West Texas. The first topic was the EIA reports and their forecasts vs. accuracy.

David is a rockstar, as usual, looking at a possible 60 to 90 days in $100 oil and Sasquatian power in Canada. The wind energy failed and actually went to negative energy to try and defrost the wind turbines.

Stu brings up some great points for the first time. - According to the EIA standards, to hit net zero by 2050, we need to build 995,000 wind turbines, an average of 34,000, and we have only made a maximum number of 5,680.

We have a blast talking energy, and we want to hear any questions you may have. Please send them to questions@energynewsbeat.com.

Other Sandstone Media Energy Podcasts – Check them out! Sponsorships are available or get your own produced by Sandstone Media.
David Blackmon LinkedIn

DB Energy Questions
The Crude Truth with Rey Trevino
Rey Trevino LinkedIn
Energy Transition Weekly Conversation
David Blackmon LinkedIn
Irina Slav LinkedIn
Armando Cavanha LinkedIn

Loading comments...