121GW Range Switch Cycle Testing

6 years ago

Full testing of the 121GW multimeter using the new shim solution.
Inspections after 1000, 11000, 25000, and 50,000 cycles.
Sorry about ad-hoc nature of the edit, this was pieced together from lots of random footage.
*UPDATE:* We completely screwed the pooch! We installed the shim upside down! There was supposed to be contact friction between the shim and the plastic case (which created all the dust). Apparently we were too dumb to read UEI's instructions precisely. Doh.

Loading comments...