How to Build a House Addition - Foundation flooded, setting TJI 210 I-joist Part 11

2 years ago

We had a little bit of delay, we have been getting some much needed rain. The foundation flooded, and we had to pump the water out. Then we got the TJI-210's set in an evening.

With the down time, I drew the joist layout with Fusion 360, made a cut list. Double checked the sizing of the joist ForteWeb.