Footage of the Crimean bridge after the emergency, consequences of the explosion.

2 years ago
24

The first trains on the Crimean bridge will go by 20:00, the Russian Ministry of Transport said. Restoration work is currently underway, the department said.

“Currently, an initial assessment of the state of the infrastructure of the railway part of the Crimean bridge has been carried out with a view to the possibility of passing trains. Restoration work is underway. According to experts, the performance of the section and the organization of the movement of the first trains will be ensured by 20:00 Moscow time,” the Ministry said.
-
The head of the Crimea, Sergei Aksyonov, recorded a video message after the emergency on the Crimean bridge. According to him, work on the restoration of the bridge will begin immediately after the investigative actions are completed.

As a result of the incident on the Crimean bridge, two spans of the roadbed leading from Krasnodar to Kerch collapsed. The head of the Crimea Sergey Aksyonov announced this in his Telegram channel.

-
Investigators have established information about the blown up truck and its owner.

"This is a resident of the Krasnodar Territory, investigative actions have been launched at his place of residence. The route of the car's movement and the relevant documentation are being studied," the Investigative Committee said.
#crimea #crimeanbridge #fire #damage #fueltank #cargotrain #bridgespan #traintanks #collapse #collapsed #kerchbridge #kerch #kerchstrait
-------------
The moment of the explosion on the Crimean bridge from 2 videos, truck was blown up:
[https://youtu.be/StOEzxhYi7E]
-Crimean Bridge Fire: Navigation of Ships in Kerch Strait Continues, two car spans collapsed:
[https://youtu.be/DFW-milPsxQ]
-
Cargo train’s tank car catches fire on Crimean Bridge, part of the span collapsed:
[https://youtu.be/g2gjwzctzPk]

Loading comments...