Should be used to determine the accuracy of work results. Should be used to establish and document the extent to which the project has been completed. Will be used to develop the basis for an audit of the project 38. All of the following statements about the work breakdown structure are correct except: It is a planning tool. It is a results-oriented and project element classification. It is a set of work packages. It is a method of schedule development.