Premium Only Content

Dr Kelvin Kemm_Business Report Interview (1)
South Africa ready and capable to build Nuclear Reactor power generation at Zero Co2 emission.
Dr Kelvin Kemm , a nuclear physicist was appointed as chairperson of the South
African Nuclear Energy Corporation (Necsa) in 2016. Adri Senekal De Wet Executive Editor of
Business Report and Independent Analyst Corrie Kruger caught up with Dr Kemm for a most
informative interview.
Koeberg is South Africa’s only nuclear power station and contributes significant amounts of
electricity to the grid, with each generator producing 921MW. We asked Dr Kemm for his opinion on
the state of the Koeberg Nuclear facility in the light of fake news, misinformation, prejudice and
factual situations regarding the facility. An example of fear mongering can be read into the way
certain energy experts and the media convey their message.
Energy analyst Prof Hartmut Winkler, a physicist and energy analyst at the University of
Johannesburg raised concerns about the delays at Koeberg, stating that Koeberg amounts to two
stages of load shedding. Already in July, the fact that one unit was off, meant that we had stage 6
load shedding. So, it is concerning they did not do the main job, to make the changes to extend the
licence for another 20 years.
Dr Kemm on the other hand explained that the Koeberg facility has supplied South Africa with the
cheapest electricity at 40 cents per KW for over 40 years. He referred to the maintenance work on
the steam generators, needed for license renewal in 2024. (If the license is not renewed, Koeberg
will not be allowed to operate beyond that date.) Dr Kemm explained that the so-called lifespan of
Koeberg is not “strictly” the initial 40 years but was merely stated for the licencing application
purpose. It is true that there are some work required. The units were scheduled to be offline for six
months each for the refurbishment work, but the process has been hit with delays. The unit was
meant to undergo a significant modification during its downtime replacing its three heat exchanges
with new ones. However, the containment building had not been built in time for the work to
commence.
Dr Kemm explained that the latest technology will be implemented in the maintenance program,
and this will enhance the capacity of Koeberg by 10%
Dr Kemm added that South Africa was once world leaders in nuclear research especially with its
research on the so-called Pebble Bed Nuclear Reactor. At one time there were over 2,000 employees
working daily on developing this reactor. Advanced new reactor designs offer the potential to
transform the nuclear power industry, providing safe, carbon-free electricity that addresses the
plethora of challenges arising from de-carbonization of power grids worldwide.
Adri Senekal De Wet and Corrie Kruger
19/08/2020
-
1:04
AfricanNewsAgency
1 year ago $0.30 earnedSPU
3.7K -
6:05:13
Akademiks
13 hours agoDay 1/30. Drake Drops lawsuit vs iHeartMedia? Offset and Cardi Calls it Quits. 50 v Jim Jones?
180K12 -
2:55:11
TimcastIRL
10 hours agoDemocrat TANTRUM At Trump Speech BACKFIRES, Trump Polls UP, Dems UNDER FIRE w/67Kevin | Timcast IRL
175K90 -
1:25:23
Kim Iversen
12 hours agoFrom Doctor to Political Prisoner: Dr. Simone Gold on COVID Lies, January 6th, and Medical Tyranny
113K68 -
2:09:28
Melonie Mac
13 hours agoGo Boom Live Ep 39!
71K10 -
1:04:36
Man in America
15 hours ago🚨 BREAKING: Dr. Robert Young JAILED! Medical Tyrants Will Do ANYTHING to Silence Truth
63.7K42 -
3:01:44
I_Came_With_Fire_Podcast
13 hours agoPanama CANAL BlackROCKED | Left of PODCASTING | Ukraine AID GONE
46.9K8 -
45:56
Glenn Greenwald
12 hours agoLee Fang Reacts to Trump's Speech to Congress; Will DOGE Tackle Military Waste? | SYSTEM UPDATE #418
111K100 -
43:23
Donald Trump Jr.
13 hours agoNo Clap: Dems are a Disgrace but My Father is Bringing Back Common Sense | Triggered Ep.222
151K123 -
18:29
The Rad Factory
1 day ago $4.97 earnedBuilding Shred Eighty a Custom Honda Snow Kart
62.5K6