Race Boat Life - Another Day 133 - The Allmand SuperNova Project

2 years ago
2

Picking up where we left off. We have to start at the bottom of the motor and work our way up. With lots of parts still sitting in piles we have a lot to do. With the blistering sun at least it helps with installing hoses that have never been installed before. We have to back track a little but it was expected. There is a lot of wires, a whole lot of wires and they all need a home.

Loading comments...