#WalkthroughwithFuquan 001 | Part Three: 651 Grove St, Montclair, NJ

4 years ago

Welcome to another episode of #WWFuquan, a behind-the-scenes walk-through series dedicated to showing the before, during, and after process of property restorations, providing you with insights into the work that goes into this arduous (yet rewarding) process.

In this episode, Fuquan checks up on his Montclair renovation project as it progresses toward the finish line. After catching up on valuable time, and with the prime-time window for listing the property slowly closing in, there are still some challenges to overcome.

The challenges that came up include getting board approval for a variance, waiting for a public services engineer to move a gas line, and mismatched interior finishes. Each challenge puts pressure on the timeline and ultimately digs into the profits.

Even though challenges and delays pop up, Fuquan tells us it’s all part of being in real estate, and that it’s important to adapt and find ways to overcome them.

Thanks for tuning in to another edition of #walkthroughwithfuquan. Subscribe to Fuquan's YouTube channel for more walkthroughs, discussions, and content surrounding Real Estate and the Note Business.

Follow Fuquan Online Here:
Instagram: https://www.instagram.com/fuquanbilal/
Facebook: https://www.facebook.com/fubilal/
Twitter: https://twitter.com/Fuquanbilal

â–º Subscribe to Fuquan's channel here: https://www.youtube.com/c/FuquanBilal

#restorations #walkthroughwednesday #njproperties

Loading comments...