Mason Jar and abandoned tunnels. Crum, Kermit, Williamson, West Virginia

2 years ago
117

Tunnel information below...
As you know i was down in Virginia visiting the Natural tunnel and catching an amazing NS coal drag thru there, and it was time to head home, we went to visit the local town of Appalachia, then we headed home I got to pikeville and and seen route 119 and knew that went into Williamson WV, just had to go up route 52 and show you these great tunnels along the NS heartland corridor of the pocahontas division.

The Norfork Southern Heartland corridor links the port of Norfolk Virginia to Chicago Illinois, via Columbus Ohio.
The Heartland corridor project started in 2007 and opened September 9 2010. It cost 321 million to complete. Its purpose was to build an intermodal yard in Columbus Ohio, and to fix clearance along the route to run double stack trains, which previously took 3 days travel time, now takes 2. The project addressed vertical clearances of 28 tunnels and 24 overhead obstructions in the Appalachian mountains. This is how the Mason jar tunnels were born.
To accommodate the double stacks, rounded tunnels were transformed to square roofs and 8 tunnels with arched roofs went thru linear notching and tracks were lowered. resulting in the now famous Mason jar tunnels.

if you liked this video, consider Hitting the SUPER THANKS button. or choose and action blow to help support my channel.

If you would like a TriGogglin hat pin. It is $10.00 includes shipping. just drop me an Email to thesaff23@gmail.com and we can work out the details.

To support my channel, stop by my stores and buy some "Merch" add to that mug collection.

https://teespring.com/stores/trigogglin

Or you can donate at
https://paypal.me/trigogglin?locale.x=en_US  and help me out with future fishing trips and future builds, for glues, paints and such.

Thanks again for stopping by and watching Mason Jar tunnels

Loading 2 comments...