They Love Their Numbers..The Maglev Highspeed Train Tunnel System International /Transcontinal Was Built On >>6.66 Below The Surface Route 66 Is Sure Connected
(October 13th 1995) Dr. Richard Sauder interviewed about his meticulously researched book "UNDERGROUND: Bases & Tunnels- What is the Government trying to hide".