1. Canadian Pacific Train H06 switching at Havelock

    Canadian Pacific Train H06 switching at Havelock

    2
    0
    2
  2. Herzog Ballast train at Havelock CP H08

    Herzog Ballast train at Havelock CP H08

    2
    0
    3
  3. Nephton freight train arrives at CP Havelock

    Nephton freight train arrives at CP Havelock

    2
    0
    6
  4. Teamster Rail work KLR Job 3 (CP H08)

    Teamster Rail work KLR Job 3 (CP H08)

    22
    2
    9
  5. The Crotch Switch is Lined in Our Favor: Work Train H06

    The Crotch Switch is Lined in Our Favor: Work Train H06

    3
  6. Canadian Pacific President’s Train at Cobourg Ontario CP 40B

    Canadian Pacific President’s Train at Cobourg Ontario CP 40B

    2
    0
    9
  7. Uphill Both Ways: CP Nephton Subdivision

    Uphill Both Ways: CP Nephton Subdivision

    2
    0
    13
  8. CP Rail Havelock Yard and Nephton Sub

    CP Rail Havelock Yard and Nephton Sub

    19
    2
    23
  9. Kawartha Lakes Railway Runner at Indian River Bridge

    Kawartha Lakes Railway Runner at Indian River Bridge

    2
    0
    9
  10. Shortline Railroading Done Right: Kawartha Lakes Railway

    Shortline Railroading Done Right: Kawartha Lakes Railway

    28
  11. 7 on the New Track, Don’t Touch the One on the Bumper!!

    7 on the New Track, Don’t Touch the One on the Bumper!!

    7
  12. Short Lining done right The Kawartha Lakes Railway

    Short Lining done right The Kawartha Lakes Railway

    2
    0
    6
  13. 47 year old Covered Hopper headed for scrap

    47 year old Covered Hopper headed for scrap

    32
    4
    11
  14. Canadian Pacific Train through Downtown Peterborough Ontario

    Canadian Pacific Train through Downtown Peterborough Ontario

    15
    1
    31
  15. CP Rail returning to Quaker Oats Peterboro

    CP Rail returning to Quaker Oats Peterboro

    26
    4
    23
  16. Northbound CP Train out of Havelock

    Northbound CP Train out of Havelock

    52
    7
    6