1. S2 EP28 | WOODWORK | TIMBER FRAME BASICS | FINISH SETTING PURLIN POSTS FOR THE CABIN

    S2 EP28 | WOODWORK | TIMBER FRAME BASICS | FINISH SETTING PURLIN POSTS FOR THE CABIN

    7
    0
    27
  2. S2 EP39 | WOODWORK | TIMBER FRAME BASICS | MILLING FLOOR JOIST | SEALING TIMBERS | CAMPFIRE COOKOUT

    S2 EP39 | WOODWORK | TIMBER FRAME BASICS | MILLING FLOOR JOIST | SEALING TIMBERS | CAMPFIRE COOKOUT

    30
  3. QA12 | RAISED BED GARDENING AT THE TIMBER FRAME CABIN | Q&A ON PLANS FOR THE CABIN | LIVESTREAM MAY

    QA12 | RAISED BED GARDENING AT THE TIMBER FRAME CABIN | Q&A ON PLANS FOR THE CABIN | LIVESTREAM MAY

    2
    0
    21
  4. S2 EP32 |WOODWORK | TIMBER FRAME BASICS | SETTING RAFTERS FOR THE CABIN IN THE SMOKY MOUNTAINS

    S2 EP32 |WOODWORK | TIMBER FRAME BASICS | SETTING RAFTERS FOR THE CABIN IN THE SMOKY MOUNTAINS

    24
  5. S2 EP19 | TIMBER FRAME | OUTDOOR FOREST KITCHEN | LAYING BRICK FOR FIRE PIT

    S2 EP19 | TIMBER FRAME | OUTDOOR FOREST KITCHEN | LAYING BRICK FOR FIRE PIT

    29
  6. S2 EP5 | WIDOWMAKER | FINISHING THE DECKING ON THE OUTDOOR COMPOST TOILET

    S2 EP5 | WIDOWMAKER | FINISHING THE DECKING ON THE OUTDOOR COMPOST TOILET

    6
    1
    34
  7. S2 EP2 | TIMBER FRAME | WOODWORK | SETTING POST FOR OUTDOOR COMPOST TOILET

    S2 EP2 | TIMBER FRAME | WOODWORK | SETTING POST FOR OUTDOOR COMPOST TOILET

    3
    0
    28
  8. S2 EP3 | OUTDOOR COMPOST TOILET | SETTING BEAMS FOR THE FOUNDATION AND BRIDGE

    S2 EP3 | OUTDOOR COMPOST TOILET | SETTING BEAMS FOR THE FOUNDATION AND BRIDGE

    28
  9. QA9 | WOODWORK | TIMBER FRAME | MILLING FLOOR JOIST | ADVICE ON CABIN BUILDING

    QA9 | WOODWORK | TIMBER FRAME | MILLING FLOOR JOIST | ADVICE ON CABIN BUILDING

    17
  10. Cool device for a router. Woodworking.

    Cool device for a router. Woodworking.

    13.5K