1 year agoChamplain Towers Collapse Modeled Roof Collapse Part 4Construction Engineering & Failure Analysis
2 years agoChamplain Towers Collapse Professor Dawn Lehman response videoConstruction Engineering & Failure Analysis
2 years agoChamplain Towers Collapse Column offset and removal of BMA changed dynamics of garage and pool deckConstruction Engineering & Failure Analysis
2 years agoChamplain Towers Josh Porter, Miami Herald, Sprinkler System, Pool co YET CONDO ASSOC IS AT FAULTConstruction Engineering & Failure Analysis
2 years agoChamplain Towers Fire Suppression System Deep Dive 2hr video 6hr editing time, what a shower revealsConstruction Engineering & Failure Analysis
2 years agoChamplain Towers South Collapse Tributary ares reveals cracks towards columns = punch shear PLUSValueEngineering
2 years agoChamplain Towers NIST SILENCED MY CHANNEL B/C OF THE VIDEO OF THEM DESTROYING EVIDENCEValueEngineering
2 years agoChamplain Towers Collapse Deck was composite (like layers of 2x12 on scaffolding) Rectangular arrayConstruction Engineering & Failure Analysis
2 years agoChamplain Towers Collapse HOW a single crack reveals Deck Failure Punch Shear DEFLECTION of DECKValueEngineering
2 years agoChamplain Towers Collapse How a single crack reveals Deck Failure Punch Shear DeflectionValueEngineering
2 years agoChamplain Towers Collapse MYSTERY photographer plus Jealous Wall Still TalkingValueEngineering
2 years agoCHAMPLAIN TOWERS COLLAPSE Nist samples soil after is has been cycled with water for a yearConstruction Engineering & Failure Analysis
2 years agoChamplain Towers Surprise then background data on sprinkler system u must learn 4future understandinValueEngineering
2 years agoChamplain Towers Collapse Building Code column position off by 50 DEGREES BMA was NOT an OPTIONValueEngineering
3 years agoChamplain Towers Critical Shear areas were 3 sided and NOT balanced #champlainTowerConstruction Engineering & Failure Analysis
3 years agoChamplain Towers Modeled deck failure Topside rebar unzipping explainedConstruction Engineering & Failure Analysis
2 years agoChamplain Towers Collapse NIST hires the WRONG PERSON FOR THE JOB cronyismValueEngineering
2 years agoChamplain Towers North Concrete Shoring installed let's discuss it Cantilever ConcreteValueEngineering
2 years agoChamplain Towers Existing Cracks revealed Cantilever Planter Box and slab sectionValueEngineering
2 years agoChamplain Towers, how the slab-beam construction had larger steel in top zonesValueEngineering