Q

Quading

19 Followers
    The snow melt
    1:38
    The two coats of primer is on
    3:11
    Sanding is done the primer goes on tomorrow
    3:18
    3 coats of mud sanding is next
    1:12
    Prep for the ceiling to put Gips up
    10:06
    Tape and the first coat of mud is on
    8:00
    Gips and insulation is up
    3:06
    Sanding mud technique
    5:36
    Wall before sanding
    0:55
    Wall after sanding
    1:09
    Last portion of the wall taped and mudded
    1:39
    The other side of the wall
    3:06
    The side of the wall is done
    1:52
    First coat of paint is on looks good
    1:04
    Two coats of primer on
    2:12
    Last touch ups on the basement wall
    3:18
    2 inches of ice
    1:00
    Second coat of mud is done
    1:17
    How much snow
    1:13
    Basement Gips is finally up
    1:13
    More of this
    1:00
    One wall muddled
    1:08
    More progress on the basement
    0:42